Monday 19 September 2011

All together!

All Done! The workers arrived on Wednesday and left Friday afternoon! It was intense! It looks fantastic.  Just a fine line on the floor boards is the only evidence the house was ever split in half!!  Now we have to install the septic system and get electricity to the site.  Alister pulled out the old kitchen.  Originally I thought the kitchen may be salvageable but it was mostly hobbled together with home made shelves.  Im taking the loovres off the front verandah.  It is an awesome house.  Larger than it looks and just a bit grand.  I will post some more photos on line soon.

No comments:

Post a Comment